Cedar Lodge Refurbishment

Value:

£1,200,000

Duration:

7 months

Client:

Methodist Homes (MHA)

Completed:

February 2025

Overview

Princebuild successfully completed the refurbishment of MHA Cedar Lodge, a 47-bedroom care home operated by MHA, one of the country’s largest charitable care providers. This extensive project, valued at £1.2 million, was carried out over seven months within a fully occupied, live environment. Built in the late 1980s, Cedar Lodge required significant modernisation to enhance safety, comfort, and energy efficiency while ensuring minimal disruption to residents and staff.

Scope of Work

The project involved a comprehensive upgrade of Cedar Lodge’s infrastructure and living spaces, including:

  • Full heating system replacement, including new boilers and low-surface-temperature radiators in every room.
  • Full domestic system replacement, including new cylinders and complete fit-out within the loft, dropping to all required areas.
  • Temporary heating system installation to maintain a comfortable environment during the transition.
  • Replacement of all flexible extract ductwork.
  • New pipework in all bedrooms to serve existing en-suite facilities.
  • Installation of new LED lighting throughout corridors, day rooms, and the main kitchen.
  • Flooring and decoration upgrades in hallways, day rooms, dining areas, and common spaces.
  • Full refurbishment of bathrooms and shower rooms, including new sanitary ware, flooring, and decoration.
  • New carpet installation throughout the hallways.
  • Installation of new kitchens to modern standards.
  • Boxing in of service runs with Pendocks to ensure a clean and professional finish.

Given the care home’s fully operational status, Princebuild carefully managed the logistics, ensuring limited access to resident rooms while completing work efficiently and safely.

Summary

This project demonstrates Princebuild’s expertise in delivering complex refurbishments within live environments. By implementing a phased approach and maintaining excellent communication with staff and residents, we ensured minimal disruption while significantly improving Cedar Lodge’s facilities. The result is a modernised, energy-efficient, and comfortable care home that meets the highest standards of safety and functionality.

Testimonial from Christina Samudzi, Home Manager

“In the 11 years I have worked here, this is the only major work that has taken place, and I could not be more impressed with Princebuild’s professionalism and dedication.

The team was very well organised and highly respectful throughout the project. They demonstrated an in-depth understanding of their job, ensuring all work was carried out to the highest standards. Their commitment to health and safety was outstanding, and they conducted themselves in a very professional and smart manner, always respecting the space of both staff and residents.

During the six months of work, we faced three outbreaks, but Princebuild managed to adapt seamlessly, ensuring minimal disruption while maintaining high safety standards. Communication with Tom and Paul was excellent, making sure we were always informed and updated. Every member of the team on-site was respectful of their surroundings and contributed to a positive working environment.

The final finish was left in absolute perfection—we couldn’t have asked for more. Their flexibility and ability to build strong working relationships have been truly commendable. Paul even attended relative meetings to provide an overview of the project, which was greatly appreciated by families, making them feel valued and informed.

Princebuild has set a benchmark in professionalism, communication, and respect, and I highly recommend them for any future projects.”

Read our Privacy Policy and remember that you can withdraw your consent at any time.
Skip to content